Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jan 10, 2024     Naca Air vents backup strips - (6 hours)       Category: Interior Finish
decided to use nutplates for attaching the NACA scoops to the fuselage for both the front NACA (cockpit ventilation) and the back NACA for the Aerosport Air vents.
I ordered the VANS Clear aluminum Air vent for the front panel.
Preparing the strips has been a bit of filing work but the intermediate result is good.
I need to cut the backing strip along the NACA scoop and i will need to countersink the plastic scoop for the #8 flush screws. I will then install the nutplates to the alustrip.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.